News Flash

News Flash

Posted on: October 21, 2019

CONEZONE: S. Grand Ave. Night Closures and Periodic Holds

Cone Zone

Crews are making great progress on the south leg of the new roundabout. During this work, northbound traffic should anticipate up to 15-minute periodic holds. Southbound traffic should continue to use Buffalo Valley for alternate access.

S. Grand Ave. Night Closures 10/23-25

Nightly Wednesday, October 23rd through Friday, October 25th from approximately 7 PM to 6 AM, the south leg of the intersection at Grand Ave. and 27th Street will be closed for night work. For alternate access to areas...

Additional Info...

Glenwood Springs News
Posted on: October 17, 2019

CONEZONE: S. Grand Ave. Routing Changes

Cone Zone

For the next several weeks, Grand Ave. south of 27th Street is northbound traffic only at the intersection. Use Buffalo Valley for alternate access.

27th Street Bridge crews have completed the north leg of the new S. Grand Ave and 27th Street roundabout and motorists may now drive through the intersection. Pedestrians should continue to use the crosswalk by Rivers Restaurant. Please continue to exerci...

Read on...

Glenwood Springs News
Posted on: October 16, 2019

6th Street wooden buffalo are up for auction

Buffalo pallet art

The recycled pallet buffalo sculptures are now available for purchase through an online auction until October 30, 2019 at 4 p.m.

Click here for the auction link.

The herd of nine wooden buffalo pieces are each available and will be sold separately. The buffalo range in size from approximately 5’x5’ to 7’x5’9”, with the bull being the...

More information

Glenwood Springs News
Posted on: October 8, 2019

Leaf drop-off site is now open

Fallen Leaves

Glenwood Springs residents can now take their leaves to the annual leaf drop-off site at 380 County Road 116 (Airport Road) through November 1. However, the November 1 date may be extended as needed due to a later fall season this year.

Leaf drop-off remin...

Read on...

Glenwood Springs News
Posted on: September 25, 2019

Two Rivers Park closure for construction begins October 7

Two Rivers Park

Construction of the boat ramp and river walk project begins October 7 and will continue through April

Closure and Impacts

The closure of the entire park, including the boat ramp along the Colorado River, will remain in effect through April 2020.

During the closure, pedestrians and cyclists will not be able to enter the park from the Rio Grande Trail pedestr...

Read on...

Glenwood Springs News
Posted on: September 13, 2019

6th Street Roundabout Work to begin Monday, Sept. 16

6th Street roundabout

The City of Glenwood Springs will be starting the 6th Street roundabout area landscaping installation work on Monday, Sept. 16. This first phase will run through mid-November.

This first phase will run through mid-November, weather depending, and will install irrigation, electrical, lighting, decorative boulders, trees, sod, and ornamental grasses throughout the project site, which includes adjacent islands and the approach to ...

Read on...

Glenwood Springs News

News Flash

Posted on: October 17, 2019

Real-time Ride Glenwood arrival info is available on Transit app!

Real-time locations for Ride Glenwood and RFTA regional buses is available in an easy to use mobile app called Transit. Real-time predictions are based on GPS data from the actual Ride Glenwood and RFTA vehicles, so you know where your bus is and when it ...

Read on...

Transportation